Télécharger Imprimer la page

Silverline HO0001 009 Mode D'emploi page 22

Publicité

Les langues disponibles

Les langues disponibles

ASSEMBLY OF PRODUCT
10
ASSEMBLY OF PRODUCT
Checking the Wall
Fig. 13
Fig. 14
22
n
It is important that the wall is straight, upright and has sufficient
load-bearing capacity.
n
It is necessary that the depth of the drill holes corresponds to
the length of the bolt.
n
It is possible to use the mounting accessories, bolts and
dowels included in the product for brick walls. In case of other
constructions (e.g. plaster, board, porous concrete), it is neces-
sary to use appropriate dowels and fixing bolts.
DANGER!
Before drilling, ensure that there are no power, gas
or water pipes in the close proximity of the drilling
locations.
1 - 3.5x9.5 Screw
2 - Flue Connection Plate
In the installation accessory 2 chimney connection plates must be
installed with 4 screws 3.5x9.5.()
1 - M5x35 Screw
2 - Hanger Plate
Install 2 hanger plates in the mounting accessory with 2 screws
M5x35 ()
ENGLISH
06.03.2023

Publicité

loading

Ce manuel est également adapté pour:

Ho0015 009