Télécharger Imprimer la page

Daikin VRV IV REYQ72TATJ Serie Mode D'emploi page 26

Masquer les pouces Voir aussi pour VRV IV REYQ72TATJ Serie:

Publicité

Les langues disponibles

Les langues disponibles

Precautions when knocking out knockout holes
To punch out a knockout hole, hit it with a hammer.
Open an appropriate hole as needed.
After knocking out the holes, trim off the burr, then we recommend
you to paint the edges and areas around the edges using the repair
paint to prevent rusting.
Power line: Open a knockout hole as shown at right and connect it
using a conduit.
Choose an appropriate knockout hole for conduit size suitable for
the power and ground line to be used.
Transmission line: Connect it using a conduit in the knockout hole
on the left.
Knockout hole (Transmission line) f7/8 in. (22.2 mm)
Knockout hole (Power line)
Burr
NOTE
After wiring work is completed, check to make sure there are no loose
co
c io
o
c ric
10. Air tight test and vacuum drying
r fi i
i i
or c rr o
NOTE
Always use nitrogen gas for the air tightness test.
Absolutely do not open the stop valve until the main power circuit
insulation measurement has been completed. (Measuring after the
stop valve is opened will cause the insulation value to drop.)
eeded tools
Gauge manifold
To prevent entry of any impurities and insure
Charge hose
fici
r
valve
special tools dedicated for R410A.
Use charge hose that have pushing stick for con-
necting to service port of stop valves or refriger-
ant charge port.
Vacuum pump
The vacuum pump for vacuum drying should be
able to lower the pressure to 500 microns.
c r
the refrigerant pipe during the pump stops.
The system for airtight test and vacuum drying
rri
o
r
o
co
tank, and a vacuum pump to the outdoor unit.
The refrigerant tank and the charge hose connection to refrigerant
c
r
or or
i
r i
r ri
r
o
23
f7/8 in. (22.2 mm)
f1-1/8 in. (27.8 mm)
f1-3/8 in. (34.5 mm)
r i
co ro o
ir i
c
r i
r r
i
c
oi
r o
c
r i o
c
i ro
r ri
r
r
o
r
i
6
1
4
C
2
3
5
1
Pressure reducing valve
2
Nitrogen
3
Measuring instrument
4
Refrigerant R410A tank (siphon system)
5
Vacuum pump
6
Charge hose
7
High/low pressure gas pipe stop valve
8
Suction gas pipe stop valve
9
Liquid pipe stop valve
10 Refrigerant charge port
11 Outdoor unit
12 To Branch Selector unit (indoor unit)
13 Stop valve
14 Field piping
15
o
16 Stop valve service port
A
Valve A
B
Valve B
C Valve C
NOTE
The air-tightness test and vacuum drying should be done using the
service ports of suction gas pipe, high/low pressure gas pipe and
i
i
i
o
panel of the outdoor unit for details on the location of the service
or
r
o
REYQ72T
o or
i
r ri
handling the stop valve.
The refrigerant charge port is connected to unit pipe. When
shipped, the unit contains the refrigerant, so use caution when at-
taching the charge hose.
Air tight test
Pressurize the suction gas pipe, high/low pressure gas pipe and liquid
i
ro
r ic
or o
c
o
r
ri
or
i
drop within 24 hours, the system passes the test.
11
11
A
7
10
8
9
B
12
16
13
14
15
c
o
ro
REYQ96-168T
r
o
or
i o
o
o
i
r
r
o
o
3P362438-5N English
o

Publicité

loading