Télécharger Imprimer la page

Daikin VRV IV REYQ72TATJ Serie Mode D'emploi page 11

Masquer les pouces Voir aussi pour VRV IV REYQ72TATJ Serie:

Publicité

Les langues disponibles

Les langues disponibles

Fasten the unit in place using 4 foundation bolts
7/16 in. (M12). It is best to screw in the founda-
tion bolts until their length remains 13/16 in. (20
mm) above the foundation surface.
NOTE
There are restrictions on the refrigerant pipe connecting order
between outdoor units in the case of the multi system.
O
oor
i co
i
i
i
o
roo
and be sure to waterproof all work.
Make sure the area around the machine drains properly by setting
up drainage grooves around the foundation.
Drain water is sometimes discharged from the outdoor unit when it
is running.
For anti-corrosion type, use nuts with resin washers. If the paint on
nut connections comes off, the anti-corrosion effect may decrease.
Resin washer
6.5. Method for removing shipping plates
The shipping plates installed over the compressor legs for protecting
the unit during transport must be removed. Proceed as shown in the
r
roc
r
o
Shipping plates
Front
96-168T type
Front
72T type
1 Remove shipping plates.
2
r
o i
co
r
or fi i
m))
3P362438-5N English
A=13/16 in. (20 mm)
io
o
or
i
r
roo oor i
ro
o
Shipping plate
Shipping plates
o
i
lbf
Bolt
Shipping plate
NOTE
If the unit is operated with the shipping plates still attached, abnormal
vibration or noise may be generated.
6.6. Method for opening the sliding plate
The sliding plate should be moved to the open position in the following
r
io
o
i i i
r
r ri
NV, AZ, NM, OK, TX, AR, LA, MS, AL, TN, GA, NC, SC, FL and Latin
America.
1 Remove the left screw (1 pc.) and loosen the right screw (1 pc.).
SLIDING PLATE
2
o
i i
o
ri
3 Reinstall the left screw and tighten both the left and right screws.
Compressor
i
i co ro o
SCREW
rro
o O
8

Publicité

loading