3.
INSTALLATION
THE BURNER MUST BE INSTALLED IN CONFORMITY WITH LEGISLATION AND LOCAL STANDARDS.
3.1 HEAT GENERATOR FIXING
Put on the flange (1) the screw and two nuts, (see fig. 3).
➤
Widen, if necessary, the insulating gasket holes (4).
➤
Fix the flange (1) to the heat generator door (3) using screws (5) and (if necessary) the nuts (2) inter-
➤
posing the insulating gasket (4), (see fig. 2).
After installation ensure that burner is lightly inclined as in fig. 4.
➤
Fig. 2
Fig. 3
3.2
WORKING POSITION
1
20062489
20058598
2
3
4
4
GB
20059471
Fig. 4
20059470
5
6