GB
General Information
This GROHE product is designed for use of an IAPMO-
listed, 1.6 GBF, wall-mounted WC with bowl rim heights
of 15 3/4" to 19 11/16".
A 1/2" supply pipe and a 3" wastewater pipe are required.
The product complies with: A 112.6.2
It has been designed for a 2" x 4" framework. The framework
must be installed at a distance of 24 5/8". Build the
framework and additionally secure with nails.
The element feet must be pre-adjusted in accordance with
the final height of the WC.
Please refer to the ceramic manufacturer's information for
the adjustment dimensions.
Caution: Take account of height of finished flooring.
Ensure that all structural shell apertures are cut out cleanly
and aligned perpendicularly.
Installing WC element
Preparation
1. Prepare aperture for wastewater connection and prepare
framework, see page 1, Fig. [1].
Refer to the dimensional drawing on cover page.
2. Make apertures for flush pipe, drain pipe, bolts and
inspection chamber in gypsum fiber board, Fig. [2].
Installation
1. Position element in prepared framework and adjust to
desired height, see Fig. [3].
2. Mark drill holes on framework, see Fig. [4].
3. Remove element from framework.
4. Drill marked holes in framework, see Fig. [5].
5. Fasten element to framework and align, see Fig. [6].
Installing water connection
1. Install water connection and flush pipes according
to EN 806, see page 2, Fig. [7] and [8].
2. Remove transport protection, see Fig. [9].
3. Shut off water supply. Connect water supply pipe to filler
valve, see Fig. [10].
Further installation:
1. Install bolts with structural shell protection and inspection
chamber, fit protective caps, see Fig. [11].
2. Attach prepared gypsum fiber board, see Fig [12].
Only proceed with further steps after tiling work is complete.
Installing ceramic WC bowl
1. Remove structural shell protection for bolts and protective
caps.
2. Push pipes as far as possible into flush pipe. Mark the
position, see page 3, Fig. [13].
3. Remove pipes again, push onto ceramic bowl and mark
the position, see Fig. [14].
4. Measure distance "X", see Fig. [15]. Cut off length x+1/8"
from both pipes.
5. Deburr pipes, see Fig. [16].
6. Install pipes without using grease or oil, see Fig. [17].
7. Adjust bolt length to required dimension, see Fig. [18]. The
dimension is derived from the thickness of the ceramic
bowl and the length of the fasteners for the ceramic bowl.
8. Apply joint compound, see page 4, Fig. [19].
9. Attach fastenings. For sound insulation, the GROHE
special accessory, order no. 37 131 can be ordered
separately, see Fig. [20].
10. Install ceramic WC bowl, see Figs. [21] - [23].
Maintenance filler valve
Shut off the water supply.
Maintenance, see page 5, Figs. [1] to [6].
Maintenance waste
Seal, see page 6, Figs. [1] and [2].
Assemble in reverse order.
Setting flow volume
The flow volume is set to 6 liters at the factory.
To change the factory setting, see page 6.
F
Information générale
Ce produit GROHE est conçu pour l'utilisation d'un WC
suspendu 1.6 GBF répertorié par l'IAPMO avec une hauteur
de bord de cuve comprise entre 400mm et 500mm.
Une conduite d'alimentation 1/2" et une canalisation
d'évacuation DN 90 sont requises.
Le produit est conforme : A 112.6.2
Il a été conçu pour un cadre de 38mm x 140mm. Le cadre
doit être installé à une distance de 625mm. Monter le cadre
et le fixer avec des clous.
Les pieds des éléments doivent être préréglés en tenant
compte de la hauteur finale du WC.
Les cotes de réglages sont données dans les indications du
fabricant de carrelage.
Attention : tenir compte de la hauteur du sol préparé.
S'assurer que tous les orifices de l'installation provisoire sont
propres et à la perpendiculaire.
Installation, élément de WC
Préparatifs
1. Préparer l'orifice pour le raccordement d'évacuation ainsi
que le cadre, voir page 1, fig. [1].
Tenir compte de la cote du schéma de la page de titre.
2. Exécuter dans le panneau de placoplâtre les orifices pour
le tube de rinçage, le tube de trop-plein, le boulon et la
trappe de visite, fig. [2].
Installation
1. Placer l'élément dans le châssis préparé et le tirer à la
hauteur souhaitée, voir fig. [3].
2. Repérer les alésages sur le cadre, voir fig. [4].
3. Retirer l'élément du cadre.
4. Exécuter les alésages repérés dans le cadre, voir fig. [5].
5. Fixer l'élément dans le cadre et l'orienter, voir fig. [6].
Installation du raccordement d'eau
1. Installer le raccordement d'eau et rincer les tuyauteries
selon EN 806, voir page 2, fig. [7] et [8].
2. Retirer la protection de transport, voir fig. [9].
3. Couper l'alimentation en eau. Raccorder l'arrivée d'eau à
la conduite d'arrivée d'eau, voir fig. [10].
Suite du montage :
1. Monter le boulon avec la protection du gros œuvre et la
trappe de visite, installer les capuchons de protection, voir
fig. [11].
2. Installer le panneau de placoplâtre préparé, voir fig. [12].
N'effectuer les étapes ultérieures qu'après la pose du
carrelage.
7

Publicité