Télécharger Imprimer la page

Kessel Aquapump Medium LW 600 Instructions De Pose Et D'utilisation page 26

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 29
4.6
Installing the level measurement
Systems that have float switches for level measurement
do not have control units and an alarm probe. In this
case, ignore the associated steps.
Install the alarm probe in the following position:
Clip the D1 protective tube onto the horizontal bracket.
Clip the D2/D3 protective tube onto the riser pipe.
Screw the alarm probe into the protective tube, route the
cable through the cable duct.
Install the level measurement:
Note the connection lengths of the submersible pressure
switch.
Lay the pressure hose with a constant upward gradient in
order to avoid the accumulation of condensation.
Pull the cable(s) for level detection through the cable
duct.
Seal the cable duct airtight and watertight.
4.7
Control unit
If there is a control unit, attach and connect it according to the relevant instructions.
Installation of the system is completed.
26 / 88
Installation and operating instructions
328-198_03

Publicité

loading