1. INSTALL DUCTWORK
Plan where and how the ductwork will be installed.
Install proper-sized ductwork, elbows and roof or
wall cap for the type of blower you are installing. If
using 7" or 8" round ducts, or 3 1/4'' x 14'' duct, use
a transition. Use 2" duct tape to seal duct joints.
STANDARD INSTALLATION
Roof cap
3 1/4" x 14" to 8''
transition if
3 1/4" x 14" duct
Wall
cap
HH0029A
INSTALLATION WITH 7" OR 8" ROUND DUCT
Roof cap
Wall
cap
HH0015A
INSTALLATION WITH EXTERIOR BLOWER
External blower
External
blower
HH0016A
All manuals and user guides at all-guides.com
3 1/4" x 10" or
3 1/4" x 14" duct
Hood with
interior blower
7" or 8" round duct
3 1/4" x 10"
to 7" or 8" transition
Hood with
interior blower
10" round duct
Hood with
exterior blower
- 4 -
2. MEASURE INSTALLATION
Dimensions for the most common installations are
shown below.
We recommend you to install the hood at a
minimum of 20" from an electric range and
24" from a gas range.
For optimal performance, the hood should not be
installed more than 30" from cooktop.
Cabinets
Hood
Backsplash
(Optional)
HH0004A
Cabinets
Hood
Backsplash
(Optional)
HH0003A
20" minimum
clearance
(24" for gas)
Standard 36" h.
cook top
30" maximum
clearance
Standard 36" h.
cook top