Télécharger Imprimer la page

BRÖTJE HEIZUNG NEOP 300 Notice De Montage page 26

Masquer les pouces Voir aussi pour HEIZUNG NEOP 300:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 31
en
5 Installation
Fig.20
Fit the air hose and outlet pipe of
the gas-fired condensing boiler
8
9
Fig.21
Fitting the outlet pipe
26
7. Stick the air hose according figure into the connection of the pump.
8. Connect the power cable of the pump according to the connection
diagram (see chapter
9. Plug the outlet pipe of the gas-fired condensing boiler to the inlet
connection of the neutralization unit.
7
RA-0001682
10. Stick the outlet pipe on the outlet connection of the neutralisations unit
and place with downward slope to the house drainage (or connect
with the condensate lift unit)
10
Caution
Inlet and outlet pipes must be laid with continual downward slope!
If no free drain is possilbe, a condensate lifting unit must be used!
11. Check all connections for leaks.
RA-0001683
connection diagram ).
7311618 - 05 - 11122020

Publicité

loading