Télécharger Imprimer la page

BRÖTJE HEIZUNG NEOP 300 Notice De Montage page 24

Masquer les pouces Voir aussi pour HEIZUNG NEOP 300:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 31
en
5 Installation
5
Installation
5.1
Assembly
Fig.16
Removing the lock
Fig.17
Inlet and outlet installation
2
24
Danger of electric shock
Prior to commencing any installation work, isolate the system from
the power supply and safeguard against unintentional
reconnection! All electrical work in connection with the installation
must only be carried out by a qualified electrician!
1. Remove the lock with pliers out of the outlet opening.
1
RA-0001677
2. Stick the inlet connection to the stop in the inlet opening and secure
with the hose clamp.
3. Stick the outlet connection with the pipe screen in the outlet opening
3
and secure with the hose clamp.
4. Distribute the granulate evenly in the neutralisation pipe by shaking.
Caution
If the inlet and outlet are completely covered with granulate, there
is the risk of getting plugged!
RA-0001678
7311618 - 05 - 11122020

Publicité

loading