Start Up; Important Checks Before; Access To The Configuration Key Pad - aldes Cube 300 Notice De Montage

Masquer les pouces Voir aussi pour Cube 300:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

5. START UP

5.1 Important checks before starting
Check the following before turning on the power:
• Check that the power cable is not damaged
• Check the power supply voltage and the correct position of the neutral pole.
• The unit must be earthed.
• Check that the wires of connectors are the correct colour.
• Make sure that aeraulic ducts are correctly connected.
• Make sure that the condensation drain is correctly connected to a drainage pipe through a water trap.

5.2 Access to the configuration key pad

Remove the electronics card access panel by removing the screw and then pressing the button at the top .
Remove the right filter access panel by pressing
on the two buttons at the top .
41

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cube 370

Table des Matières