Télécharger Imprimer la page

Miele PDW 909 Schéma D'installation page 33

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 51
Drain pump (de-
pending on
model)
The machine with hot water connection also requires a cold water
connection.
In machines with drain pump, the suds are drained through a drain
pump with a delivery head of max. 1 m.
The drain hose must be installed free of kinks for the suds to drain
freely.
There are the following options for draining the machine:
- Drain hose connected to a plastic drain pipe with a rubber sleeve
(there is no need to use a siphon)
- Drain hose connected securely to a sink with a plastic nipple
- Connected securely to a floor drain (gully)
If required, the hose can be extended to a length of up to 5 m. The
corresponding accessories are available from the Miele Customer
Service Department or your Miele dealer.
For a drain height of more than 1 m, a replacement drain pump for a
delivery head of max. 1.8 m is available from the Miele Customer Ser-
vice Department or from your Miele dealer.
Dispenser connection
The machine is equipped with an interface for external dispenser sys-
tems. Adapters for pre-mixed suds or liquid detergent from external
dispenser systems for up to 6 connections should be obtained from
the Miele Customer Service Department and connected.
A separate Connector Box is required for controlling the dispensing
pumps electrically. This must be installed by your Miele dealer or
the Miele Customer Service Department. It is particularly important
to follow the manufacturer's instructions when using a combination
of cleaning agents and special application products.
en - Installation notes
33

Publicité

loading