6. Assembling the exterior control cabinet
Before installation, a strip or solid
foundation must be properly prepared.
For foundation plans refer to page 24.
250 mm
When the foundation is being cast, the
drawn dimensions must be adhered to,
particularly the position of the hole
through which the hoses will be led
later.
There are four M10 holes in the base
of the cabinet. These holes must be
continued in the concrete foundation
M10 holes
below.
Insert the M10 dowels into the holes.
Secure the switch cabinet with the aid
of the four M8 screws (together with
washers).
/