Cabinet Blower Preparation - Broan Elite E662 Guide D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6. INSTALL THE HOOD
6.3 Attach the second wire clamp, insert the power cable in the hood and tighten the wire clamp to secure the cable.
Place the hood under the cabinet and slide it in position. Run power cable from hood up through slot cut in cabinet.
Tighten the (4) screws completely, then add the last screw (screw # 5) in the center keyhole.

7. CABINET BLOWER PREPARATION

7.1 V
ERTICAL DISCHARGE ONLY
7.1.1 Seal the metal shutoff plate on the back of the the cabinet
blower using duct tape.
7.2 H
ORIZONTAL DISCHARGE ONLY
7.2.1 The cabinet blower included with the E662 model is factory
set to exhaust vertically. If the horizontal discharge is
chosen, remove the metal shutoff plate from the back of
the hood, by removing the 3 screws. Set aside screws.
Discard both left and right plastic diverters assembled to
the metal shutoff plate.
7.2.2 Press the metal shutoff plate on a flat surface to completely
flatten bent flange. and install on the top of the blower, using
the 3 screws previously set aside plus another #8 x
(from parts bag).
7.2.3 Fold down the foldable flange of the adapter/damper. This flange must
be at 90° from the remaining flanges. See picture beside.
7.2.4 Using three (3) #8 x
secure the adapter to the back of the cabinet blower.
Remove tape from damper flap. Seal the adapter and the
metal shutoff plate to the cabinet blower using duct tape.
(CONT'D)
'' screws provided with hood,
1
2
HD0130
HD0131
1
'' screw
2
HD0119
HO0112
HD0132
- 5 -

Publicité

Table des Matières
loading

Table des Matières