Switching On The Cad 450 - S&P CAD HE 450 H BASIC Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 36
8. SWITCHING ON THE CAD HE 450
To start your CAD HE 450 unit use the following process:
1. Verify that all system components are correctly installed and connected:
Fresh air intake duct insulated and connected correctly (Do not use a fresh air
intake equipped with insect screen)
Fresh air and exhaust ducts insulated and connected correctly
Fresh air and exhaust vents connected
Flow regulators mounted in the right direction (if installed)
Air outlet using insulated duct and connected to the outside (Using a roof cowl
or outlet without an insect screen)
Insulated flexible ducts taut and large radius bends (if installed)
Check that the unused spigots on plenums are sealed (if installed)
Condensation drain well connected (siphon)
Check that all connections are sealed (on the IDEO, on plenums and vents)
Check the setting of the power circuit breaker
2. Turn on the CAD HE.
3. Check the airflows.
34

Publicité

Table des Matières
loading

Table des Matières