Transport Inspection; Preparation - Wilo Stratos PICO-Z 25/1-6 Notice De Montage Et De Mise En Service

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 41
Scope of delivery
Transport
inspection
Transport and
storage conditions

Preparation

30
3 Delivery and storage
• High-efficiency circulation pump with 2 gaskets
• Thermal insulation shell (5)
• Wilo-Connector (9)
• Installation and operating instructions
Inspect for transportation damage and check complete-
ness immediately after delivery, and claim immediately if
necessary.
Protect from moisture, frost and mechanical loads.
Permissible temperature range: -10 °C to +50 °C
4 Installation
4.1
Installation
May only be installed by qualified technicians.
• Choose an installation point that is as easily accessible
as possible.
Caution: Damage to the pump!
An incorrect installation position may damage the
pump.
• Select the installation point in line with the allowable
installation position (Fig. 2).
• The motor must always be installed horizontally.
• The electrical connection must never face upwards.
• The motor head must be always tightened with 4
housing screw.
• Observe the pump's allowable installation position
(Fig. 2), rotate the motor head (3+6) if necessary.
WILO SE 10/2019

Publicité

Table des Matières
loading

Table des Matières