Télécharger Imprimer la page

Wallenstein PT302 Instructions D'installation page 6

Publicité

Step 7
Once the backhoe is straight and level and the Center Link and
Outer Link Bars are aligned, loosely bolt them together with
3041W203 RH Backhoe Strut (item 8) and 3041W204 LH
backhoe Strut (item 9) using Z71740 3/4"NC x 4" hex head
bolts (item 21) and Z72271 3/4" hex locknuts (item 23).
Bolt the opposite end of the struts to the backhoe brackets with
Z71720 3/4"NC x 2" hex head bolts (item 19) and Z72271 3/4"
hex locknuts (item 23).
23
21
If a PTO Hydraulic Power Pack is being used
with the backhoe, the drawbar brace cannot be
installed. Skip Steps 8–11.
Step 8
Assemble two 304L214 Lower Linkage Plates (item 5) to the
tractor's draw bar as shown. Use three 71740 3/4"NC x 4" hex
head bolts (item 21) and Z72271 3/4" hex locknuts (item 23).
Assemble with 3042W105 Drawbar Tab (item 11).
Fasten Drawbar Tab (item 11) to the tractor's swinging drawbar
with Z71730 3/4"NC x 3" hex head bolt (item 20), 3041L211
Drawbar Washer (item 3), and Z72271 3/4" hex locknuts (item
23).
5
23
19
23
14
20
11
21
23
PT302
Step 9
Assemble 3041L213 Upper Linkage Plates (item 4) to the tie
back assembly as shown below. Use two 71740 3/4"NC x 4"
hex head bolts (item 21)and Z72271 3/4" hex locknuts (item
23).
Step 10
Attach Z11501 Toplink (item 14) to the upper linkage plates with
Z71635 5/8"NC x 3-1/2" hex head bolt (item 18) and Z72261
5/8"NC hex locknut (item 22).
4
Step 11
Check once more that your backhoe is straight and level. Adjust
if required and snug up the turnbuckle.
Step 12
Tighten up all the bolts to finalize the assembly.
Step 13
Check backhoe functions:
• start the tractor
• lower the stabilizers
• check all functions of the backhoe
• double-check all fasteners and three-point hitch is
solidly attached and secure
6
21
23
18
22
14

Publicité

loading