Télécharger Imprimer la page

ChefLine SkyLine Mode D'emploi page 18

Publicité

Reassembly of the parts removed during the cleaning.
Before reassebling of parts, clean the evaporapor tube and drip trays & grids without using abrasive
cleaners. Before reassemblyng the bowl gasket rinse it with water in order to facilitate the assembly
of the bowl.
Put the bowl gasket in its position on the back part of the evaporator tube.
Once the bowl gasket is in its right position press it with your thumbs first in the lower part and then
progressively towards its upper part (marking a circle with your fingers); until it is correctly fixed in its
site (see Pict. 40 & 41).
Pic. 42
CORRECT
Insert the spiral blade by pushing it gently and deeply as indicated in Pict. 44a & 44b. After this it is
important to lubricate the head of the spiral (see Pict. 43).
Pic. 43
17
REASSEMBLY OF THE COMPONENTS
Pic. 40
INCORRECT
Insert the suction cap gasket into the
spiral blade by pushing it deeply (see
Pict. 42).
Lubricate with water.
Pic. 44a
Pic. 44b
Pic. 41

Publicité

loading