INSTALLATION
Given the complexity of installation operations, they should be carried out by at least two people.
11
12a
If the hood is fitted in the recirculation version, bear in mind that there must be a minimum dis-
tance of at least 8-10 Cm left between the top of the hood and the surface above it (ceiling or
shelf).
Draw the following on the Wall:
• a Vertical line up to the ceiling or top surface, at the centre of the area in which the Hood is to be
fitted;
• a Horizontal line: 650 mm min. above the Cooker Top.
• As shown in the drawing, mark a reference point (1) 116 mm from the vertical reference line, and
533 mm above the horizontal reference line.
• Repeat this operation on the other side, checking to ensure it is level.
• Drill the points marked using a ø 8 mm drill bit.
• Insert the plugs 11 into the holes.
• Tighten the 2 screws 12a (4.2 x 44.4) provided in the bores, leaving a gap of 5-6 mm between the
wall and the heads of the screws.
• Lock the 2 screws Vr located on the connection points for the Motor unit 3.
• Hook the Motor unit 3 to the screws 12a.
• Turn screws Vr to level the hood canopy.
• Mark the reference points (2) for the brackets hooked under the Motor unit 3, as shown.
• Drill the points marked using a ø 8 mm drill bit.
• Insert the plugs 11 into the holes.
• Insert 2 of the screws 12a (4.2 x 44.4) provided into the bores.
• Tighten the 4 screws 12a fixing the Suction Unit completely.
EN
Drilling the Wall and Fixing the Motor unit
300
116
116
1
1
2
2
Rear Ducting Outlet
12a
Vr
7
7