Lutron GRAFIK Eye QS Serie Instructions D'installation page 3

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 19
QS Link Wiring Methods (choose one)
• System communication uses SELV / PELV / NEC
wiring.
• Follow all local and national electrical codes when installing
SELV / PELV / NEC
Class 2 wiring with line voltage / mains
R
wiring.
• Each terminal accepts up to two 18 AWG (1.0 mm²) wires.
• Total length of control link must not exceed 2000 ft (610 m).
• Typical Wire Sizes: See table opposite.
Powered by GRAFIK Eye
Powered by a QS Link Power Supply
Rear View of
GRAFIK Eye
R
QS
Control Unit
®
Class 2
R
QS Control Unit
R
1 2 3 4 5 6 L N
See QS Link Wire
SELV / PELV / NECR Class 2 Power wiring:
2: V+
1: Common
See QS Link Wire Sizes
table on Page 2
(1) twisted pair
22 AWG
(0.5 mm
)
2
(1) 18 AWG
(1.0 mm
)
2
Common
QSPS-P1-1-35V
(provides up to 8
power draw units)
To power source
• Connect the terminal 1, 3, and 4 connections to all
control units, wallstations, and control interfaces in the
QS system. For terminal 2 connectivity, please refer to the
wiring diagrams below.
• The QSE-IO can be powered by the following devices:
- A GRAFIK Eye
QS control unit
R
- A QS link power supply (QSPS model numbers)
- A Quantum
Light Management Hub (see Quantum
R
documentation)
- An Energi Savr NodeT unit
Rear View of
GRAFIK Eye
R
Control Unit
Data Link:
QS
4: MUX
Link
3: MUX
Sizes table
on Page 2
QS Link
1: Common
2: V+
3: MUX
4: MUX
QSE-IO Control Interface Installation Instructions 3
QS
To additional wallstations/
control interfaces
QS
Link
To additional wallstations/
control interfaces
Lutron
R
Cable
See QS Link
Wire Sizes table on Page 2
R

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Grafik eye qse-io

Table des Matières