10. Put the sealing gasket at the air outlet of the range hood, and fix the check valve with eight ST4.2×18 screws. Attach
the duct to the check valve and seal with aluminum tape, make sure that the duct connection is sealed, and then plug it in.
Note: Please straighten the flexible aluminum duct when mounting,
to avoid noise generated when the flexible aluminum duct is semi-
stretched, and cut off the excess parts with wire pliers. The
connection between the air outlet pipe and the wall hole or the
public flue must be tightly sealed to ensure that the air outlet pipe
is firmly connected with the check valve or the public flue, and
ensure that the blade at the connection of the check valve or the
public flue is opened and closed flexibly.
11. After installation, the
range hood must be kept
horizontal. In the end,
insert the oil cup and
power it for test run.
●
Installation with upper cabinet and decoration panel
Note: first confirm the distance between the upper cabinet and the cooker supporting surface. Select 6" or 12" decoration
panel if the distance exceeds 32- "(825mm).
1. Open the container and take out the machine, and check the items inside against the packing list.
2. Open the duct hole at the top of the upper cabinet according to the opening position and size as shown in the picture
below;
3. Draw a vertical center line in the installation position, and then use the beam detector to find the beam to fix the hitching
leg, and mark it with a pencil.
Check valve
ST4.2×18 screw
Check
valve seal
1
/
2
Duct diameter
Wall
Hole diameter
1
Ø6"(Ø153mm)
Ø6- /
"(Ø165mm)
2
Duct
Aluminum
tape
3
/
"
8
(1 0mm)
35
Range Hood
3
/
"
8
(1 0mm)