Every 6 months, do some operations and checks following, depend of the automatism intensity of
use.
Without power:
• Clean up moving parts (internal edges of rail).
• Control the belt tension.
• Clean up sensors and photoelectric cells.
• Check that the alignment of leafs door is correct then stoppers position.
With power:
• Control the stability of the door, if the movement is regular and without friction.
• Control the correct operation of every command functions.
28
Product maintenance