3. cable
Disconnect the cable from the line. Also disconnect opposite end to avoid errors due to leakage
from other equipment. Check each conductor to ground and /or lead sheath by connecting one
megohmmeter lead to a ground and /or lead sheathe and the other megohmmeter lead to each of
the relative conductors. Check insulation resistance between conductors by connecting megohm-
meter leads to conductors in pairs.
78