Télécharger Imprimer la page

Airzone ZBS Manuel D'installation page 13

Masquer les pouces Voir aussi pour ZBS:

Publicité

Les langues disponibles

Les langues disponibles

-
Webserver Cloud connection or BACnet integration gateway. Connect your Webserver Cloud or BACnet Gateway
to the automation bus of the Control Board (follow the steps shown on the Assembly section).
All Airzone systems must be connected to internet to offer technical support.
It is only necessary to connect one Webserver Cloud per installation (control of up to 32
systems), for BACnet integration gateway, one per system.
-
Auxiliary Heat and other peripherals. If your system includes auxiliary heat, connect the auxiliary heat relays of the
ZBS Control board to the elements to control.
-
Powering the system. Use the power input to power at 110 / 230 Vac the control board and any others control
elements that require it. To do that, use a 3x1,5 mm² cable (AWG 15 3 wired). For added security, secure the wires
using the turret.
Check all the assembly and the connection are correct (see section
Configure the system.
-
Configure the secondary modules to associate them then to a main thermostat (see section
-
Configure all the thermostats (see sections
Check the correct operation of the system (See
Access all our technical documents and the self-diagnosis section, check the most FAQs,
certificates, watch our videos and read our declaration of conformity at:
myzone.airzoneusa.com to place it together with your installation.
Assembly and connection evaluation
Initial setup
and
Advanced settings
Initial Configuration Evaluation)
myzone.airzoneusa.com
Commissioning
).
Secondary zones settings
).
.
document available on
).
13

Publicité

loading