GENERAL REQUIREMENTS
Strictly follow the directions outlined in this manual:
This system must be installed by a qualified technician.
Make all the connections with total absence of power.
Set and connect the elements in accordance with the electronic regulations in force.
In order to connect the elements of the system, use the cable: shielded twisted cable formed by 4 wires
(AWG 20 4 wired).
Do not connect the "-" pole in the "+" terminal. It may damage the device.
For elements externally powered at 110/230 Vac, for the communications, it is only necessary to connect the poles "A"
and "B" of the bus. Connecting the "+" and " -" power poles is not recommended.
To connect the actuators to the actuator outputs, use a 2-core section cable (0.75 mm
Follow the color code for all the elements of the system.
Do not place the system bus close to lines of force, fluorescent lights, motors, etc. It might cause interference on the
communications.
It is recommended to label all the actuator outputs in order to facilitate their subsequent identification.
Follow these recommendations to locate the thermostats:
Important: According to the current local and national regulations, it is mandatory to add a switch (or other element to
disconnect the system) to the external supply wiring so that a constant separation between poles is guaranteed. The system
will restart automatically if the supply is eventually turned off.
2
).
11