Télécharger Imprimer la page

Derungs Dmed Triango 100 Instructions D'installation Et De Fonctionnement page 28

Lampe d'examen

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 38
ENG
6
metric
A
Pull the ceiling tube cable through the opening
A of the ceiling holder
Insert ceiling tube into the ceiling holder
Secure the safety screw 1 and the M8 nut
1
6
metric
Tighten the safety screw 1 and the M8 nut (20
Nm)
Tighten all 4 grub screw 2 (5 Nm)
DANGER
Electric shocks are life-threatening.
Switch off the fuses before working on the
power connection
This device may only be connected to a
mains power supply with a protective earth
conductor (PE) to prevent any risk of an
electric shock
Create the power connection
Connect the ceiling tube plug with the power
supply plug
28
All manuals and user guides at all-guides.com
A
2
4
metric
3
metric
Push cover and retaining ring over the ceiling
bearing and tighten them (0.5Nm)
Continue with luminaire head assembly, see
Chap.7
5
MOUNTING Triango 100 W
5.1
Workload data
Bending moment M
B
Vertical weight F
G
5.2
Attach ceiling bracket
DANGER
Assembly by qualified personnel
Mounting must be done by qualified personnel
only. Lack of appropriate knowledge could be life-
threatening.
DANGER
Danger to life through electric shock
All poles of the luminaire must be separated
by an external lockable switch from the power
supply network.
CAUTION
Determine the fastening means to use accord-
ing to the workload data table
Observe the dimensioning of the rod before
assembly
275 Nm
155 N

Publicité

loading