SWB505 MultiMount™ / SWB605 PowerMount™ Weigh Module » Installation
Options for Securing the Weigh Modules
7
»
BOLT
the weigh module:
OR
Bolt top plate
to tank leg
This end only:
Tank Leg
do NOT use washers
for 4400kg / 10'000lb
module
Concrete/Foundation
Mounting plate surface must be level to 1/2° or
All weigh modules must be in the same plane within 3mm (1/8").
L oad Cell Cable Connection and Cable Protector Installation *
8
»
Cable-to-Cable
1.
2.
3.
POWER
4.
• Align connectors
correctly
• Tighten connectors
5.
• Protect connectors from
mechanical shock
• Use heat gun to shrink-
6.
wrap connection
- OR -
LEVEL AND GROUT
OR
Bolt base plate
Bolt top plate
to tank leg
Shim as
Leveling Adjustment Nut
needed
Expansion
Anchor
1mm
(1/16")
100mm (6")
At Load Cell
1.
2.
3.
4.
5.
Download Installation Guide:
Installation Guide is available in:
English, German, Spanish, French,
Italian, Dutch, Portuguese, Swedish,
Danish, Norwegian, Polish, Czech,
Hungarian, Russian, Turkish
www.mt.com/ind-downloads-multimount
- OR -
the weigh module:
Tank Leg
Bolt base plate
Nonshrink
Epoxy Grout
Anchor
Concrete/Foundation
Insert
J-Bolt
* Cable Protector Placement
Cable protector is mandatory for SWB605 with cable
connection as
shown, optional for SWB505. Refer to Cable
Protector Installation Guide 30315556 for installation
instructions.
Download Installation Guide:
Installation Guide is available in:
English, German, Spanish, French,
Italian, Dutch, Portuguese, Swedish,
Danish, Norwegian, Polish, Czech,
Hungarian, Russian, Turkish
www.mt.com/ind-downloads-powermount
WELD the weigh module:
• Remove load cell from weigh module before welding.
• Ground wire of welder must be as close to the weld
seam as possible to ensure proper grounding.
Contact authorized METTLER TOLEDO technician for
proper removal and re-installation of load cells.
Size 1 weld: 5mm (3/16")
Size 2/3 weld: 9mm (3/8")
25mm (1") long
on 75mm (3") centers
Tank Leg
Contact authorized METTLER
TOLEDO service technician to
activate the weigh modules for
startup and calibration.
Installation Tips and Precautions:
• Never cut the load cell's cable or extend
its length.
• Avoid moisture and dust.
• Ensure voltage stability – use a regulated
power supply.
• Avoid overload and shock.
• Ensure good grounding.
• For hazardous area installations in
Europe, refer to enclosed instructions
(30104376 / 175389R).
Contact Information:
www.mt.com/contact
© 2021 Mettler-Toledo GMbH
11/2021
|
61807399
|
Rev G

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Swb605 powermount

Table des Matières