SWB505 MultiMount™ / SWB605 PowerMount™ Weigh Module » Installation
Before You Begin
1
»
Never extend or cut the load cell's
cable length. Always remove the
load cell before welding.
1
Make Sure Locking Plates are Installed
4
»
During installation, each weigh module must be equipped with
a SafeLock™ locking plate and centering spacer.
Locking
Plate
SafeLock™ Locking Plate (Sizes 2 and 3)
Tools You Need:
2
- OR -
- OR -
- OR -
Anti-Lift Bolt
Anti-Lift
Bolt
Checking Sleeve
Checking
Sleeve
Centering Spacer
Centering
Locking
Spacer
Plate
SafeLock™ Locking Plate (Size 1)
Download Installation Guide:
Installation Guide is available in:
English, German, Spanish, French,
Italian, Dutch, Portuguese, Swedish,
Danish, Norwegian, Polish, Czech,
Hungarian, Russian, Turkish
www.mt.com/ind-downloads-multimount
Plan Your Layout
2
»
Sample Orientations
Mounting Optional Pads
5
»
Tank Leg
Tank Foot
Plate
Pad
Weigh Module
Top Plate
Locking Nut, or
Nut with Locking
Washer
Download Installation Guide:
Installation Guide is available in:
English, German, Spanish, French,
Italian, Dutch, Portuguese, Swedish,
Danish, Norwegian, Polish, Czech,
Hungarian, Russian, Turkish
www.mt.com/ind-downloads-powermount
Position the Weigh Modules
3
»
Block the tank when
in raised position.
Lift tank
1
TANK
Position weigh modules under tank
2
legs according to your layout
Mounting Optional Stabilizer
6
»
1 or 2 stabilizers can be installed.
Chamfered stand-off
Chamfer
(for 4.4t / 10k model)
Use Thread Lock
Compound