Installation Notes & Maintenance - Pentair PENTEK SOLAR DRIVE PSD15 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION NOTES:
Date Installed: ___________________________________________________________________
Serial No. (Spec Label): ___________________________________________________________
Installer: ________________________________________________________________________
Phone: __________________________________________________________________________
Location of Installation: __________________________________________________________
Pump Model No: _________________________________________________________________
Motor: HP, Vac, Ph, SF Amps ______________________________________________________
Static Depth: (m/ft) _______________________________________________________________
Flow Rate: (lpd/gpd) ______________________________________________________________
PV Panel Manufacturer/Model Number: ____________________________________________
No. of Solar PV Panels in Series: ___________________________________________________
Note to Installer: Record the data listed above along with DIP switch setting for future reference.
Give manual to end user or attach to Pentair Pentek* Solar Drive when installation is complete.
Maintenance:
The Pentair Pentek Solar Drive is designed to operate autonomously, however it is suggested to
be inspected every 3 months. If there are any external obstructions that prevent proper cooling
of the heat sink, please remove them to make sure nothing blocks the air flow from the bottom of
the device.
If the Pentair Pentek Solar Drive will operate in a location where freezing temperatures may
occur, deactivate the system with the DC Disconnect during these conditions. This will prevent
the pump from potentially dead heading against a frozen pipe.
Check external sensors every 3 months: float switch, pressure switch, etc.
14
P1061 (06/06/19)

Publicité

Table des Matières
loading

Table des Matières