Roughing-in Dimensions
Fig.1
SUPPLY
DN 25 mm
108-133 mm
(1" I.P.S.)
(4-1/4" to 5-1/4")
-C-L-
*CRITICAL
LEVEL
152 mm
(6")
(Min.)
FOR 1-1/2" TOP
SPUD FIXTURES
*Note: The Critical Line (-C-L-) on Vacuum Breaker
must typically be 6
Consult Codes for details.
Right or Left Hand Installation
TYPICAL WATER CLOSET INSTALLATION:
AFWALL
FINISHED WALL
57 mm Min.
(2-1/4")
371 mm
CRITICAL
(14-5/8")
LEVEL
-C-L-
295 mm
SEE ROUGH-IN
(11-1/2")
RECOMMENDED TOOLS; Fig. 2
1. Teflon Tape
2. Flat Blade Screwdriver (For adjusting Supply Stop)
3. Adjustable Wrench
4. Tape Measure
5. Hacksaw
6. Tubing Cutter
7. File
FINISHED WALL
38mm-127mm
(1-1/2-5")
6047.1x1
ROUGH-IN
DIMENSION
292 mm
(11-1/2")
6047.117
ROUGH-IN
DIMENSION
610 mm
(24")
6047.1x2
ROUGH-IN
DIMENSION
686 mm
(27")
"
(152mm) minimum above fixture.
TOILET SHOWN
™
SUPPLY
DN 25 mm
(1" I.P.S.)
108 mm, +/-13 mm
(4-3/4")(+/-1/2")
ABOVE
FINISHED
FLOOR
Roughing-in Dimensions
Fig.2
6047.1x1
SUPPLY
371 mm
DN 19mm
108-133 mm
(14-5/8")
(4-1/4" to 5-1/4")
(3/4" I.P.S.)
6047.117
*CRITICAL
689 mm
LEVEL
(27-1/8")
6047.1x2
152mm
765 mm
(6)
(30-1/8")
(Min.)
*Note: The Critical Line (-C-L-) on Vacuum Breaker
must typically be 6
Consult Codes for details.
TYPICAL URINAL INSTALLATION: WASHBROOK URINAL SHOWN
FINISHED WALL
57 mm Min.
(2-1/4")
371 mm
-C-L-
(14-5/8")
295 mm
(11-1/2")
Fig.2
1
5
7
3
FINISHED WALL
38mm-127mm
-C-L-
295mm
(11-1/2")
371mm
(14-5/8")
FOR 3/4" TOP
SPUD URINAL
"
(152mm) minimum above fixture.
Right or Left Hand Installation
SUPPLY
DN 20 mm
CRITICAL
(3/4" I.P.S.)
LEVEL
-C-L-
SEE ROUGH-IN
ABOVE
FINISHED FLOOR
2
4
10'
6
M965874 Rev. 1.1 (1/19)
(1-1/2-5")
-C-L-
108-133 mm
(4-1/4" to 5-1/4")
3
8