Broan-NuTone AE60 Guide D'installation Et D'utilisation page 16

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3.
INSTALL THE UNIT
3.7 E
XTERIOR
3.7.3
C
ONNECTING
Make sure the insulated ductwork vapor barrier does not tear during
installation.
1. For each exterior hood, using a jig saw, cut a 6'' diameter hole in the exterior wall.
Run each flexible duct through its respective hole in the wall.
The exterior backplate must be installed with the word "TOP" pointing
upward.
2. For each exterior hood, pull back the
insulation to expose the flexible duct and,
using a tie wrap, attach it to the inner ring
of the exterior backplate. Carefully seal
with duct tape (A). Pull the insulation over
the joint. Pull the vapor barrier over the
insulation and over the outer ring of the
exterior backplate. Apply gently duct tape
to the joint making an airtight seal (B).
3. Attach the exterior backplate to the exterior
wall. Using four provided screws, fix it to
the wall. Seal the backplate with caulking,
as shown beside.
4. Snap each assembled exterior hood on its respective backplate location and
secure each of them with their 2 provided screws.
VD0087
O
(
) I
PENING
S
I
D
NSULATED
UCTS TO
S
CREW
(CONT'D)
NSTALLATION
2 E
XTERIOR
CAUTION
CAUTION
VD0095
VD0096
16
(
'
)
CONT
D
H
OODS
A
VD0097
B
S
CREW

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ea1500Hv 1.5

Table des Matières