711CS SWING CLEAR NEW CONSTRUCTION INSTALLATION (CONTINUED)
4
Check for proper operation, and adjust door if necessary.
4a
Close door and check for proper
operation and clearances. There should
be Z\," clearance between top of door
and bottom of frame header, and Z\,"
clearance between frame and edge of
door when door is closed.
4b
If lateral adjustment is required, loosen
frame leaf screws and shim where
needed.
5
Lock down door position.
5a
Retighten all screws.
¹⁄₈"
(3.2 mm)
¹⁄₈"
(3.2 mm)
8