4
Check for proper operation, and adjust door if necessary.
4a
Close door and check for proper
operation and clearances. There
should be Z\," clearance between top
of door and bottom of frame header,
and Z\," clearance between frame and
edge of door when door is closed.
4b
If lateral adjustment is required, loosen frame leaf screws and adjust door. Retighten screws.
5
Lock down door position.
5a
Install #12-24 x 3/4" self-drilling tapping screws into the round holes of the frame leaf to lock down the position of the
door.
700CS AFTERMARKET INSTALLATION (CONTINUED)
¹⁄₈"
(3.2 mm)
¹⁄₈"
(3.2 mm)
4