How To Install The Unit; Window Requirements - LG Goldstar WL Série Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Hardware Installation
WK Series

How to Install the Unit

1
To prevent vibration and noise, make sure the unit
is installed securely and firmly.
2
Install the unit where the sunlight does not shine
directly on the unit.
3
The outside of the cabinet must extend outward for
at least 12" and there should be no obstacles, such
as a fence or wall, within 20" from the back of the
cabinet because it will prevent heat radiation of the
condenser.
Restriction of outside air will greatly reduce the
cooling efficiency of the air conditioner.
CAUTION
: All side louvers of the cabinet must remain exposed to the outside of the structure.
4
Install the unit a little slanted so the back is slightly lower than the front (about 1/2").
This will force condensed water to flow to the outside.
5
Install the unit with the bottom about 30"~60" above the floor level.

Window Requirements

NOTICE
: All supporting parts should be secured to firm wood,
masonry, or metal.
• This unit is designed for installation in standard double
hung windows with actual opening widths from 23"
to 36".
• The top and bottom window sash must open sufficiently
to allow a clear vertical opening of 15" from the bottom
of the upper sash to the window stool.
14 Room Air Conditioner
Cooled air
23" to 36"
15" min
Stool
(With frame curtain)
Interior wall
1
20
/
" min.
12
(Without frame curtain)
Fence
Awning
Heat
radiation
About
1
/
"
2
Over 20"
Offset
1
1
/
" to 1
2
Sill
Exterior
/
"
4

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Goldstar wl r1001eGoldstar wl r1201e

Table des Matières