Load Management (Optional) - SENEC Wallbox pro s Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Check whether the charging cable is plugged
into the vehicle correctly.
After a self-test has been performed and the fault
has been corrected, the front illumination lights up
white. The vehicle can request the charging process.
Six white flashes, pause, six rapid blue flashes,
pause (Fig. XIV no. 7)
Internal fault in the Wallbox.
Unplug the charging cable from the vehicle.
Disconnect the Wallbox from the power supply
by switching off the respective circuit breakers
in the building. Wait approx. 1 minute and then
switch the circuit breaker back on.
Re-connect the charging cable to the vehicle.
After a self-test has been performed and the fault
has been corrected, the front illumination lights up
white. The vehicle can request the charging process.
Troubleshooting
If one of the faults listed persists, please contact our
Customer Support team.
2.2.3

Load management (optional)

The SENEC.Wallbox pro s can be operated with
a load management system. This enables the
Wallbox to operate in various modes such as:
Operation of several Wallboxes in an integrated
network with monitored power distribution (load
management).
Operation of the Wallbox with different energy
sources such as solar energy or the normal
electrical mains.
More information is available on-line, in the instruc-
tions "SENEC.Wallbox pro s, Local Load Manage-
ment and External Load Management":
mein-senec.de > Downloads
English
29

Publicité

Table des Matières
loading

Table des Matières