All burners are factory tested and set at 400 V 50 Hz three-phase for motors and 230 V 50 Hz monophase with neutral
for auxiliaries. If it is necessary to supply the burner at 230 V 50 Hz without neutral,make the necessary alterations
referring to the wiring diagram of the burner and check that the termal relay is within the absorption range of the
motor. Also check that the fan motor rotates in the correct direction.
Once connected the burner to the gas pipeline, it is necessary to control that this last is perfectly sealed. Also verify that
the chimney is not obstructed. Open the gas cock and carefully bleed the piping through the pressure gauge connector,
then check the pressure value trough a suitable gauge. Power on the system and adjust the thermostats to the desired
temperature. When thermostats close, the sealing control device runs a seal test of valves; at the end of the test the bur-
ner will be enabled to run the start-up sequence.
Before starting the burner, make sure it is mounted correctly. Then check connections are correct according to the dia-
gram and piping is appropriate to the system. Before connecting the burner to the electricity supply, make sure voltage
corresponds to burner plate data. The connection diagram and start-up cycle are shown separately. For wiring from
control box to burner, see the enclosed connection diagram. Pay particular attention to neutral and phase connections :
never exchange them!. Vent air and impurities of gas pipe. Check gas pressure conforms to the limits stated on the bur-
ner plate when connecting a master gauge to the test port provided on the burner. Blower motor starts and pre-purging
begins. Since pre-purging has to be carried out with the max. air delivery, the burner control
circuit turns the air damper to the max. delivery position by the air servocontrol in approxima-
tely 30 seconds time. When the servocontrol is fully open, a signal to the electronic control
unit starts the 66 seconds pre-purge cycle. At the end of the prepurging time, the air servocon-
trol gets to the Low Flame position so that burner ignition is ensured at min. output.
Simultaneously the ignition transformer receives voltage and after 3 seconds (pre-ignition)
opens the gas valve. Fuel flows to the combustion head and ignites, being governed by the gas firing butterfly valve.
Two seconds after gas valves have opened, the ignition transformer is excluded from the circuit. In case of no ignition
the burner goes to lock-out within two seconds. Now the burner is operating at the min. firing rate (about 30% of the
max. firing rate). The air servocontrol runs at the Low Flame position and in case the temperature control has to be set
at the max. output it goes to a fully open position of air damper and butterfly valve. During the burner-off periods the
air dumper closes up fully.
IMPORTANT: to obtain the right adjustment of the combustion and thermal capacity it is important to analyze the
reducts of combustion with the aid of suitable instruments. The combustion and thermal capacity adjustment is done
simultaneously, together with the analysis of the products of combustion, making sure that the measured values are sui-
table and that they comply with current safety standards. On this matter, please refer to the table and figure below.
THESE OPERATIONS MUST BE DONE BY PROFESSIONALLY-QUALIFIED TECHNICIANS.
NOTE:
ALL SAFETY DEVICES (AIR PRESSURE SWITCH, MINIMUM GAS PRESSURE SWITCH, GAS SOLENOID
VALVES AND GAS GOVERNOR) SHALL BE DULY SEALED AFTER CALIBRATION AND BURNER START
UP BY ECOFLAM'S TECHNICIANS.
Natural Gas
CO
9,6%
2
CO <100 ppm
ELECTRICAL CONNECTIONS
CONNECTION TO THE GAS PIPELINE
OPERATION OF BURNER WITH GAS
ADJUSTING THE COMBUSTION PROCESS
SUGGESTED REFERENCE VALUES
1,3
30
1,25
25
20
1,2
15
1,15
10
1,1
10
20
30
420010922100 Multicalor 70 ÷ 140 PR/AB
1,2
40 50 60
80
100
200
70
90
POTENZA UTILE NOMINALE (kW)
RATED USEFUL CAPACITY (KW)
pag.13
1
0 - STOP
1 - GASOLIO
LIGHT-OIL
0
2 - GAS
1,2
300 400
600
800
1000
2000
500
700
900
EN
2