NOTICE DE POSE PUSH CONTROL 2 POINT
BLOCAGE, BLOCAGE+ DOGGING ET DOGGING
INSTALLATION INSTUCTION PUSH CONTROL SERIES FOR 2 RIM POINT
BLOCKING, BLOCKING + DOGGING AND DOGGING
11
INSTALLATION OF THE ROD COVERS AND CASE COVERS (fig 12)
Cut the rod covers
top- length X,
bottom – length Y
Position the top and bottom rods following the representation, see "Fig A"
To Connect the Push Control evolution system please refer to Instructions N01-814 and N01-704
Install and screw the latch covers and main case cover
Check if the Push-bar works correctly.
12
VERIFICATION OF WORKING:
After having finished the installation, to verify the general working of the exit and to affix the informative sticker of the bolting of the emergency exit on the equipped
leaf. The operations of verification must be done in accordance with the NFS61.933 norm in the absence of the source of tension Normal Replacement. The
operations of verifications would not know how to substitute themselves for those inherent to the other peripheral devices of the product (CMSI, UGCIS, DI...)
13
Periodicity
Monthly: Test of unlocking of the exit, and complete cycle of opening and refermeture of the leaf.
Quarterly: Test of unlocking, if the product is a D.A.S. common to several Zones of Setting in Security.
the European directive 89/336/CEE
The PUSH CONTROL products are certified in accordance with the
standard and electrical regulations of the electromagnetic compatibility
according to the European directive 89/336/CEE
NO1-705 Ind D
Fig 12
Certain materials(equipments),
as the electric
constituents(components) ask
for special techniques of
recycling.
8 / 8