Electrical Installation - Balluff BOD 26K LB06-S92-C Instructions De Service Et De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5

Electrical installation

Turn the sensor connector plug according to the installation position (Illustr. 1) so that the connection cable can be
freely connected without being bent.
Insert the socket of the connection cable into the BOD 26K connector and screw tight.
For example, secure the connection cable from sliding with a cable tie.
Connect BOD 26K as shown in figure 5.
1
BN
2
WH
3
BU
4
BK
5
GY
Illustr. 5 Connection diagram
15400229
Connection
Colour
1 (BN)
Brown
2 (WH)
White
3 (BU)
Blue
4 (BK)
Black
5 (GY)
Grey
* Laser-Disable:
A measurement is only made if the input is connected to 0V (buttons are locked) or is open.
The laser is switched off when +UB is applied to the input. The switching output and the analogue output retain their
last status.
Switch on the operating voltage (note the permissible operating voltage).
The sensor is ready to operate after a delay (≤ 300 ms). LED BA (green) must light.
For maximum precision, please allow for a heating period (approx. 5 minutes).
12
+Ub
QA
0V
Q
IN
Use
+ UB = supply voltage
QA = analogue output (4...20 mA)
0V = supply voltage
Q = switching output
IN = control input
Laser-Disable*
Button lock
Free running
when HIGH (+UB)
when LOW (0V)
when open
No. 852592 E Edition 1111; Replaces edition 0901; Subject to modification
Mounting and
operating instructions

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bod 26k lb07-s92-cBod0007Bod0008

Table des Matières