Bml-R01-M; Installation; Installing The Slide Rail - Balluff BML-R01-M Serie Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

BML-C01, BML-C02, BAM GM-ML-01-C04, and BML-R01-M_ _ _
Slide/Slide Rail - Guided Magnetic Tape Position Measuring System
3
Construction and function (continued)
3.8
BML-R01-M... slide rail
Fig. 3-7:
BML-R01-M... slide rail dimensions
4

Installation

Installation order (overview)
1. Install the slide rail
2. Install the magnetic tape and cover strip (if necessary)
3. Install the sensor head in the slide
4. Position the slide on the slide rail
4.1

Installing the slide rail

NOTICE!
Base
An uneven base will cause the slide to jam. The base for
the slide rail must be absolutely flat and clean. Install the
slide rail straight and without any deflection.
Fastening options
The slide rails can be fastened in 2 ways:
Using the installation holes in the bottom of the slide
rail (Fig. 4-1)
Using the BML-Z0008 lugs (accessory) that engage in
the groove on the side (Fig. 4-2).
12
english
Flat-head cylinder screw M4x12, 8.8, DIN 7984 in the
installation hole
Fig. 4-1:
Installing via holes in the slide rail
Lug pairs
Fig. 4-2:
Installation with lugs

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bml-c01Bml-c02Bam gm-ml-01-c04

Table des Matières