Heidolph Hei-FLOW Core Notice D'instructions page 84

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Attachments
Pump head SP quick
SP quick pump heads are equipped with a quick-release mechanism. To mount tubes on
the SP quick pump head, proceed as follows:
Place the clamping lever to left to open
the tube guide.
Turn the clamping screws counter-
clockwise until they stop (maximum
opening for maximum tube wall
thickness).
Place the tube in the open tube guide.
Move the clamping lever to the right to
close the tube guide.
In case of excessive resistance,
ensure that the clamping screws
are fully open and the tube is
suitable for the pump head!
Screw in the two clamping screws
evenly with hand force to secure the
inserted tube.
Slightly tighten the inserted tube: Pull
on both ends with moderate force.
Pre-tensioning increases the
service life of the tube and ensures
maximum operational reliability.
Perform a short test run before
commissioning to ensure continuity of
the mounted tube.
85

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hei-flow expertHei-flow ultimate

Table des Matières