Technical data
The IKA C25 Pressure Control Valve is a membrane pressure controller for laboratory
devices that require a defined water input pressure (for example the IKA C2000 basic /
control calorimeter).
C25 input pressure
C25 output pressure
Operating medium
Installation location
Ambient temperature of medium
Connection
Commissioning
Commissioning with the IKA C2000 basic / control calorimeter
The C25 pressure valve is absolutely essential on the water faucet for operation of the
C2000, and it must be preset to an output pressure of approximately 1,5 bar.
The valve is installed into the line of the water connection.
Use the handle (C2000 accessory) to divide off the hose of the water line befo-
re the dirt trap and connect the pressure control valve with the dirt trap.
4
After you turn the calorimeter on, check the pre-pressure.
Unlock the adjustment screw by raising the hand wheel (1)
and correct (2) the pressure to 1 - 1,5 bar if necessary (see
max. 20 bar
0,5 - 3 bar
Water
Any
max. 50 °C
Ø 10 (G 1/4)
Connect the hose onto the
pressure controle valve.
The connections are set up cor-
rectly if you overcome a distinct
resistance and plug the line in
all the way to the stopper.
the operating instructions for
the C2000 basic /control).
Lock the hand wheel (3) in
place so that it cannot be
adjusted unintentionally.
EN