Set Up And Preparation For Operation - Power Fist 8142606 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

SET UP AND PREPARATION FOR OPERATION

1. Bolt the Supprt Leg to the Log Splitter, lift the log splitter by the handles at both ends and place it
on a 60 - 75cm high, stable, flat and level work surface.
2. Familiarize yourself with the controls and features of this log splitter in the illustrations.
1. Oil Tank
2. Log Pusher
3. Work Table
4. Wedge
5. Lift Handle
6. Support Leg
7. Work Table Extension
w/Log Retaining Plates
8. Switch
9. Motor
10. Pushbutton Box
11. Wheels for Minor Moving ONLY
12. Lift Handle
13. Hydraulic Control Lever
14. Control Lever Guard
15. Bleed Screw
16. Oil Drain Bolt w/Dipstick
Before operating the log splitter, the Bleed Screw should be loosened by some rotations until
air can go in and out of the oil tank smoothly.
Air flow through the Bleed Screw hole should be detectable during operation of the log split-
ter.
Before moving the log splitter, make sure the Bleed Screw is tightened to avoid oil leaking
from this point.
FAILURE TO LOOSEN THE BLEED SCREW WILL KEEP THE SEALED
AIR IN THE HYDRAULIC SYSTEM COMPRESSED AFTER BEING
DECOMPRESSED. SUCH CONTINUOUS AIR COMPRESSION AND
DECOMPRESSION WILL BLOW OUT THE SEALS OF THE HYDRAULIC
SYSTEM AND CAUSE PERMANENT DAMAGE TO THE LOG SPLITTER.
7

Publicité

Table des Matières
loading

Table des Matières