Determine Wood Screw Requirements
1. A #10 pan head wood screw should be used to properly
secure the overlay panel. A total of 8 screws per drawer for
the 60 unit and 10 screws per drawer for the 80 unit will be
required. (See Figure 11). Necessary screws are supplied
with unit.
2. Use only pan head screws.
3. If your overlay panel is thinner than 5/8" (15.9 mm) you will
need to purchase shorter screws.
Step 1: Remove Drawers from unit.
1. Remove drawer from the unit. Begin by pulling out the
drawer. Locate the drawer lock which can be found on the
outside of the cabinet slide (see Figure 7). Push the back
of the drawer lock forward and then down, releasing the
drawer from the cabinet slide (see Figure 8). Repeat this on
the opposite side of the drawer. Lift the drawer up from the
slides at a 90 degree angle to fully extricate the drawer from
the cabinet (See Figure 9).
2. Remove the gasket from the drawer front. (See Figure 10).
Do this by pulling the gasket out of the channel that holds it
to the drawer front. This will expose the clearance holes for
mounting the overlay panel. (See Figure 14).
FULL OVERLAY PANEL INSTALLATION INSTRUCTIONS
Figure 8
Figure 11
(9mm/7.5mm)
12
Figure 9
Figure 10
Gasket
.35/.31
.50
(12.5)
Figure 12