Installation, Operating and Maintenance Instruction
Before starting work, check that the information on the
motor name plate is the same as the local mains
network. The power supply cable of the coupled drive
motor must be connected up in accordance with the
wiring diagram produced by the motor manufacturer.
A protective motor switch must be provided.
The direction of rotation must only be checked
when the pump is full. Dry running will cause
damage to the pump.

6. Start-up, Operation, Shut down

The plant may only be started up by people who
are familiar with the local safety regulations and
with these Operating Instructions (especially
with
the
safety
instructions given here).

6.1 Initial start-up

Before starting up the pump, check, if the following
points were controlled and carried out:
There is no need to lubricate the pump before
starting it up.
Pump and suction pipe must be filled completely
with liquid when starting up.
At vertical installation position the seal chamber
must get vented before initial start-up (air release
valve L).
Turn pump unit once again by hand and check
that it moves smoothly and evenly.
Check that lantern guard sheets are mounted and
that all safety devices are operational.
Open valve in suction /intake pipe.
Set discharge side valve to approx. 25% of rated
flow quantity. With pumps with a discharge branch
rated width less than 200, the valve can remain
closed when starting up.
Secure, that unit is electrically connected acc. to
all regulations and with all safety devices.
Check direction of rotation by switching on and off
briefly. It must be the same as the directional
arrow on the drive lantern.

6.2 Switch on drive

Immediately (max. 30 seconds on 50 Hz resp.
max. 20 seconds on 60 Hz currency feed) after
reaching normal operating speed open discharge
valve adjust the required operating point. The
pumping data shown at the type plate resp. in the
data sheet and / or the order confirmation must be
met. Every change is only permitted after talking
with the manufacturer!
Operation with closed valve in the suction and /
or discharge piping is not permitted.
On starting-up without back-pressure, the back-
pressure must be produced through throttling at
the discharge side. After reaching full back-
pressure open valve.
LMR 100-ger/fr/eng
Article No 771073201
regulations
and
safety
Page 51
Model LR, LMR, LRZ, LMZ

5.5 Final Check

It must be possible to turn the unit easily by hand at
the stub shaft.
If pump does not reach attended head or if
atypical sounds or vibrations do occur:
Switch off pump (see chapter 6.7) and seek for
causes (see chapter 10).

6.3 Restarting

Basically, the same procedure should be followed as
for starting up for the first time. However, there is no
need to check the direction of rotation and the
accessibility of the pump unit.
The pump should only be automatically restarted if it
has been made sure that the pump has remained
filled whilst stand by.
Be particularly careful not to touch hot machine
parts and when working in the unprotected shaft
seal
area.
Remember
controlled systems may switch themselves on
suddenly at any time. Suitable warning signs
should be affixed.

6.4 Limits of Operation

The operating limits of the pump / unit regarding
pressure, temperature, performance and speed
are shown in the data sheet and / or order
confirmation and must be observed under any
circumstances!
Do not exceed the output given on the motor
name plate.
Avoid
sudden
(temperature shocks).
The pump and motor should run evenly and
without vibrations; check at least once a week.
6.4.1 Flow min. / max.
If no other data are given in the curves or data sheets,
the following is valid:
Q
= 0,1 x Q
for for short time operation
min
BEP
Q
= 0,3 x Q
for continuous operation
min
BEP
Q
= 1,2 x Q
for continuous operation *)
max
BEP
Q
= Flow in efficiency optimum
BEP
*) on condition that NPSH
facility
that
automatically
changes
in
temperature
> (NPSH
+ 0,5 m)
pump
Revision 01
Issue 10/2006

Publicité

Table des Matières
loading

Table des Matières