1. Check the floor area where the tub is to be installed.
a. Clean area of any debris or trash.
b. Use a 5 or 6-foot level and determine if the floor is level. If the floor is not level, adjust all leveling
feet to perfectly level the tub.
Note: It is important that all leveling feet are completely touching the floor and level for
the door system to work properly.
2. Check to ensure that the drain piping has been "roughed-in" at the proper location. See specification sheets
(installation detail) included in this manual.
3. Ensure that the proper electrical service has been installed at the pump location. See electrical
requirements in the manual. (See page 8.)

INSTALLATION PREPARATION

7
OWNER'S MANUAL
Leveling
Feet
754818-100 Rev. A