GB
Using The Trowel
Guiding the trowel on the slab is very simple. Get into operator's position behind the centre of handle with good footing and apply the
throttle slowly until desired speed is obtained.
•
Push handle down and machine will move to the right.
•
Lift handle up and machine will move to the left.
•
Slightly twist to the right and the machine will move forward.
•
Slightly twist to the left and the machine will move backward.
•
Holding the handle in neutral position the machine will remain stationary.
Preparation Of Concrete Surface
Use of a mechanical or air vibrating screeding machine to strike the concrete surface to level will provide good compaction to the
screeded slab.
Floating Operation
After each operation the engine should be stopped.
CAUTION
Finishing Operation
water has been applied because the machine will tend to skate away. Be sure to maintain control at all times.
Pitch Adjustment
The pitch control knob is in easy reach of the operator. The pitch adjustment has an unlimited pitch variation and this can be
undertaken whenever it is necessary.
Spider Plate
By experience we know the major problem on the trowel arm is lack of lubrication. During mounting we undertake the greasing
and sealing the
Lightweight Trowel
Machine Cleaning
Clean the machine after it has been used to prevent the collection of hardened cement.
Changing Blades
Be sure spark plug is disconnected before changing the blades.
CAUTION
Remove bolts and lock washers on each trowel arm and remove the blades.
behind trowel arm.
Install bolts and lock washers on each trowel arm and fasten them.
Liability
Altrad Belle
the machine or nonobservance of the operating instructions contained in this manual.
Operating Instructions
22
2
.