Télécharger Imprimer la page

mundoclima MUSER-12-H12 Manuel D'installation page 46

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 73
INSTALLATION
Paste the supplied installation template paper in position on the 
wall, ensuring that the reference line is level using a spirit level.   
Use a 180mm core drill to drill the two holes for the units   
ventillation, ensuring that both the holes are aligned with the   
template. 
Use the template to mark the position of the screws for the   
hanging rail, using a spirit level to ensure it is straight and level. 
Drill the marked holes using a suitable 8mm drill bit and insert   
wall plugs. Line the hanging rail with the holes, and fix the rail   
into position using the supplied screws. 
Ensure that the hanging rail is securely fastened onto the wall,   
and that there is no risk of the unit tipping or falling. 
This unit must be installed on an external wall, as it vents directly out
of its rear
and ensure the wall is flat, solid and reliable.
Leave at least 10 cm of space to the left, right and base of the machine.
At least 20cm of space must be left above the unit to help air flow
smoothly and stay away from curtains, plants, faucets, furniture and
 
others appliances etc.
The hole for the drainage pipe must be drilled using a 25mm Drill bit.   
Ensure the hole is at a downward angle (min 5 degrees) so that the water 
will drain correctly. 
46
 

Publicité

loading