INSTALLATION
TOOLS REQUIRED
SPIRIT LEVEL
TAPE MEASURE
8mm MASONRY DRILL
25mm MASONRY DRILL BIT
BEFORE STARTING INSTALLATION, PLEASE ENSURE YOU HAVE ALL SUITABLE EQUIPMENT
AVAILABLE AND UNDERSTAND THE STEPS INVOLVED IN INSTALLATION. IF IN ANY DOUBT,
PROFESSIONAL ADVICE SHOULD BE SOUGHT.
THE INSTALLER MUST ENSURE THAT THE PLANNED POSITION OF THE AIR CONDITIONER IS
SUITABLE, AND THAT THERE ARE NO CABLES AND PIPES INSIDE THE WALL, AND NO OTHER
OBSTRUCTIONS FOXED ON THE WALL, WHICH WOULD PRESENT A DANGER AND/OR PREVENT
COMPLETION OF INSTALLATION.
DRILL
180mm CORE DRILL
SHARP KNIFE
45
PENCI