Atag EGL Serie Mode D'emploi page 21

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

building-in dimensions
196
62
305
177
195
420
900
WG...L/WG...R
196
62
177
195
420
WG...P
10
ø305
785-1000
425
425
ø125/150
ø125/150
530
1000
EG...L/EG...R
305
785-1000
425
ø125/150
530
900
1000
EG...P
installation wall hood
785-1000
62
785-1000
425
187
ø125/150
The key dimensions are indicated on page 10.
Set the height of the telescopic pipe within the
allowable range.
Position the discharge and the electrical
connection in such a way that it will be easy to
hook up the hood.
NB:
To prevent deformation, the tower should not
be placed on its flanged edge. Lay the tower on
its rear.
hanging the telescopic pipe
-
Draw a centre line on the wall. Hold the
196
template supplied against the wall (centre
Ø 10
line to centre line). Slide the templates over
each other until you have reached the
correct height. Mark the drill holes.
A
-
Drill the holes (10 mm). Insert plugs. Twist
two nuts in the opposite direction on the
ends of the studs and twist the studs
195
about 20 mm into the wall. Remove the
Ø 10
nuts.
-
Secure the upper telescopic pipe.
-
Attach the connecting cable and
discharge hose from the inside. Make
sure the connecting cable is not pinched
20 mm
or folded.

Publicité

Table des Matières
loading

Table des Matières