Installation Instructions - Bradley S19314 Serie Manuel D'installation

Masquer les pouces Voir aussi pour S19314 Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

S19314
1
Assembly — Connect Base and Eyewash
Standard eyewash unit is shown. Other units are similar.
Connect components before securing the base to the floor. When connecting
components, use the rubber grip pad (provided) around pipes to prevent marring.
Apply pipe sealant (supplied by installer) to all male-threaded pipe joints, making
sure not to get any excess over the edge of the pipes.
Halo unit with standard
drain option
(3) Ø
" (10mm) holes on
3
8
Ø 8" (203mm) bolt circle
10
20½"
(521mm)
pipe length
BSPP-NPT
1-1/4" Adapter
if supplied
with provided
4/9/2018
option
1¼" NPT
drain outlet
For optional foot pedal
installation, the base
must be positioned
so that the hole in the
base is perpendicular
to the user .
³⁄₈" bolts and anchors
supplied by installer .
Halo unit with 24"
drain option
12¾"
(324mm)
pipe length
Bradley • 215-1684 Rev. T; ECN 18-05-015
Installation
BSPP-NPT
1-1/4" Adapter
if supplied
with provided
option
1¼" NPT
drain outlet

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Halo s19314 serie

Table des Matières