For questions regarding the operation or installation of this product, visit www. bradleycorp.com or call 1-800-BRADLEY. Product warranties and service parts information may also be found under ”Products” on our web site at www.bradleycorp.com. Bradley • 215-163 Rev. G; ECN 12-05-016D 5/30/12...
Variations in manufacturing allow for ⁄ " (3mm) per threaded joint. To find the tolerance of a dimension, add the number of thread joints in between a dimension and multiply it by ⁄ " (3mm). Bradley • 215-163 Rev. G; ECN 12-05-016D 5/30/12...
Showerhead Assembly 204-421 Emergency Inspection Tag 128-156A Pull Rod - 25½" Long 269-915 Grip Pad (not shown) Prepack S45-122 includes items 21, 21.1, 24, 25 Prepack S45-123 includes items 21.1, 24, 25 Bradley • 215-163 Rev. G; ECN 12-05-016D 5/30/12...
Page 6
114-051 Pour toute question concernant le fonctionnement ou l’installation de ce produit, consulter le site www.bradleycorp.com ou appeler le 1-800-BRADLEY. Les garanties de produits figurent sous la rubrique « Informations techniques » sur notre site Internet à www.bradleycorp.com. Bradley • 215-163 Rev. G; ECN 12-05-016D...
66" pas fournies avec l’appareil et peuvent être fournies par (1676mm) l’entrepreneur ou achetées auprès de Bradley Corporation. au fond de la bride Étape 1: Fixation de la bride au sol 1. Installez 3 ancrages (non fournis) pour vis de ⁄...
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA TEL: 1-800-BRADLEY FAX: (262-251-5817) http://www.bradleycorp.com 114-052 NOTE: Les articles 10.1–10.5 sont préassemblés tel que 10. Les articles 26.1–26.8 sont préassemblés tel que 26. Orifice de vidange 1¼" NPT Bradley • 215-163 Rev. G; ECN 12-05-016D 5/30/12...
Tête de douche 204-421 Etiquette d’inspection 128-156A Tige - 25½" 269-915 Tampon anti dérapant (non montré) Paquet S45-122 comprend les éléments 21, 21.1, 24, 25 Paquet S45-123 comprend les éléments 21.1, 24, 25 Bradley • 215-163 Rev. G; ECN 12-05-016D 5/30/12...
Page 10
• S ID no intentar instalar la unidad combinada Bradley hasta obtener las piezas faltantes. Aclarar el conducto del suministro de agua antes y después de la instalación. Verificar que no haya fugas y que el flujo de agua sea adecuado. El suministro principal de agua a la unidad debe estar siempre en posición “ON”...
Paso 3: Conectar el suministro de agua (254mm) IMPORTANTE: No contar con la unidad combinada Brida de Ø 9" (229mm) Bradley para sostener la tubería de suministro. con (3) orificios de Ø ⁄ " 1. Conectar la tubería de suministro de agua a la (10mm) en un circulo de 10½"...
114-052 NOTA: Los artículos del 10.1 al 10.5 vienen previamente montados como Artículo 10. Los artículos del 26.1 al 26.8 vienen previamente montados como Artículo 26. Salida de drenado 1¼" NPT Bradley • 215-163 Rev. G; ECN 12-05-016D 5/30/12...